Facility Name:
|
Essex Junction
|
Caller Name And Title:
|
James Jutras Water Quality Superintendent, Chief Operator
|
Municipality:
|
Essex Junction
|
Location (street or site):
|
Essex Junction WRRF Discharge
|
Incident Start Date:
|
02/07/2019
|
Incident End Date:
|
02/07/2019
|
Incident Start End Times:
|
03:00 pm to 04:45 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged treated and partly disinfected effluent
|
Estimated Volume (gallons):
|
>100,000 to 500,000 gallons
|
Cause Of Discharge:
|
Other
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
Chlorination monitoring equipment failure. Staff started a flow proportioned chemical addition mode. This mode also failed. Upon detection, a hand mode of chlorine addition was turned on to restore proper disinfection application.
|
Waterbody Impacted:
|
WinooskI River
|
Contact Name And Title For Public:
|
James Jutras, Water Quality Superintendent, Chief Operator
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
Chlorination monitoring equipment failure. Staff started a flow proportioned chemical addition mode. This mode also failed. Upon detection, a hand mode of chlorine addition was turned on to restore proper disinfection application. An E.Coli Violation occurred as a result of the failed chlorination.
|
|
|
nForm Submission Number:
|
HNM-DZ3B-Z06GE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|