Facility Name:
|
Burlington River
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Colchester Ave. CSO
|
|
|
07/20/2021
|
|
|
07/20/2021
|
|
|
07:24 pm to 07:26 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Megan Moir, Div Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/20/2021 resulted in the discharge of a combination of sewage and stormwater from the Colchester Ave CSO . This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPA-C6S4-T4RQH
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|