|
Facility Name:
|
Burlington River
|
|
|
Nathan Lavallee, Chief Operator
|
|
|
City of Burlington
|
|
|
Colchester Ave
|
|
|
10/11/2019
|
|
|
10/11/2019
|
|
|
09:15 am to 11:00 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>10,000 to 100,000 gallons
|
|
|
Obstruction/Blockage
|
|
|
Large ball of roots blocked outlet of ma
|
|
|
Combined sewer overflow structure
|
|
|
Ball of roots was removed, and proper flow was restored.
|
|
|
Winooski River
|
|
|
Megan Moir
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A large ball of roots caused a blockage of the pipe at the Colchester CSO manhole. Estimated 52,500 gallons was discharged.
|
|
|
|
|
|
HNT-EBRZ-DHSC2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|