Facility Name:
|
Burlington North
|
|
|
Nathan Lavallee Chief Operator
|
|
|
Burlington
|
|
|
Winooski River crossing temporary pump station
|
|
|
10/23/2023
|
|
|
10/23/2023
|
|
|
10:15 am to 09:45 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Pump station emergency overflow pipe
|
|
|
Backup pump is running and parts have been overnight shipped. Lead pump should be online early am on 10/24/2023
|
|
|
Winooski River
|
|
|
Megan Moir
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
Lead temporary pump had control panel failure. Due to recent rain, backup pump was unable to keep up during morning and evening peak flows. Estimated overflow during each period was 5 gallons a minute for less than 60 minutes at 10am and 9pm.
|
|
|
|
|
|
HPY-M61X-RE90A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|