View FacilityIncident Record


Facility Name: Burlington North    
Nathan Lavallee Chief Operator    
Burlington    
Winooski River crossing temporary pump station    
10/23/2023    
10/23/2023    
10:15 am to 09:45 pm    
   
Discharged untreated sewage    
>100 to 1,000 gallons    
High Flows    
   
Pump station emergency overflow pipe    
Backup pump is running and parts have been overnight shipped. Lead pump should be online early am on 10/24/2023    
Winooski River    
Megan Moir    
   
   
nForms    
Y    
   
   
   
Lead temporary pump had control panel failure. Due to recent rain, backup pump was unable to keep up during morning and evening peak flows. Estimated overflow during each period was 5 gallons a minute for less than 60 minutes at 10am and 9pm.    
   