|
Facility Name:
|
Burlington North
|
|
|
Nathan Lavallee Chief Operator
|
|
|
Burlington
|
|
|
Winooski River siphon temporary bypass
|
|
|
10/07/2023
|
|
|
10/07/2023
|
|
|
03:46 pm to 04:44 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Pump station emergency overflow pipe
|
|
|
Storm subsided and pumps were able to keep up.
|
|
|
Winooski River
|
|
|
Megan Moir
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows due to rain. Temporary pump station could not keep with flows.
|
|
|
|
|
|
HPY-7JGN-M6AC5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|