Facility Name: Burlington North    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Winooski River Crossing    
08/04/2023    
08/04/2023    
04:06 pm to 04:40 pm    
   
Discharged untreated sewage    
>1,000 to 10,000 gallons    
High Flows    
   
Crack/hole in pipe    
Staff arrived on site shortly after the alarm. They checked on the pumps and verified that the pumps were working correctly. Watched the wet well level go down and verify a few pump cycles.    
Winooski River    
Matthew Dow, Wastewater Facilities Manager    
   
   
nForms    
Y    
   
   
   
High flows in the collection system after a rain storm cause the emergency pump station, that has replaced the broken river crossing, to be inundated with sewage. Staff arrived on site in less than 15 minutes of the alarm. The amount of sewage overflowing the pump station was reported as splashing and trickles. It is likely our estimate is high.    
   