Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington North    
Nathan Lavallee    
City of Burlington    
North Avenue WWTF    
07/12/2023    
   
   
   
Discharged untreated sewage    
Other    
Other    
Weather and Flooding    
Crack/hole in pipe    
Water Resources staff are currently evaluating options for bypass pumping to further limit the amount of sewage entering the River. Repair planning is also underway, although options are limited until floodwaters recede to allow access. We will be releasing additional details as the repair plan is finalized. We are actively responding to limit the impacts to area waters, investigating what happened, and working to prevent it from re-occurring in the future.    
Winooski River    
Megan Moir, Water Resources Division Head    
   
   
nForms    
Y    
   
   
   
Burlington, VT - Around 6AM on July 12, Burlington Department of Public Works (DPW) Water Resources staff discovered that there was a break in a wastewater pipe that crosses underneath the Winooski River. Crews were quickly mobilized to respond and the State was notified, per protocol. This break is very likely a result of the intense and powerful storm flows currently affecting the Winooski River. Data showed that flows coming into North Plant dropped off significantly in the early morning hours, consistent with a break of one of the two river crossings in our North Plant collection system. This has resulted in the discharging of untreated wastewater into the Winooski River. At this time, it appears that the volume discharging from this break amounts to approximately half of the flow of one of our smaller wastewater plants, or about 10% of the City’s wastewater flow (½ of flows from NNE). As of 8:45AM crews were able to block off the sewer crossing pipe to ensure that as much wastewater flow as possible would reach the plant for treatment.    
   
HPW-2YA9-R2SAY