Facility Name:
|
Burlington North
|
|
|
Matthew Dow
|
|
|
City of Burlington
|
|
|
Gazo CSO
|
|
|
07/21/2023
|
|
|
07/21/2023
|
|
|
06:56 pm to 07:08 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Winooski River
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7.21.2023 resulted in the discharge of a combination of sewage and stormwater from Gazo Avenue CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|