|
Facility Name:
|
Burlington North
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Gazo CSO
|
|
|
06/18/2018
|
|
|
06/18/2018
|
|
|
01:49 pm to 01:50 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
200
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Megan Moir, Div Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 6/18/2018 resulted in the discharge of a combination of sewage and stormwater from Gazo CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. We estimate the sewer portion to be less than 10 gallons.
|
|
|
|
|
|
HNE-NCJZ-71077
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|