|
Facility Name:
|
Burlington North
|
|
|
Matthew Dow, Chief Operator
|
|
|
City of Burlington
|
|
|
Gazo Ave
|
|
|
06/29/2017
|
|
|
06/30/2017
|
|
|
11:36 pm to 12:01 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Megan Moir, Water Resources Div. Head
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 29th resulted in the discharge of a combination of sewage and stormwater from CSO (insert CSO number or location). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HN5-ZMGV-TC4YE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|