|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Director of Wastewater Facilities
|
|
|
City of Burlington
|
|
|
Park CSO
|
|
|
08/10/2026
|
|
|
08/10/2026
|
|
|
09:06 pm to 10:41 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
12155
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Intervale Wetlands
|
|
|
Matthew Dow, Director of Wastewater Facilities
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on August 10th resulted in the discharge of a combination of sewage and stormwater from CSO (insert CSO number or location). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
This CSO discharged twice during the reported time, each for about 20 minutes. The combined flow has been reported.
|
|
|
|
|
|
HQQ-QKQ5-4X4QP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|