|
Facility Name:
|
Burlington Main
|
|
|
Nathan Lavallee, Wastewater Treatment Manager
|
|
|
Burlington
|
|
|
Pine Street CSO
|
|
|
08/08/2026
|
|
|
08/08/2026
|
|
|
05:07 pm to 05:40 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
47529
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Director of Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by intense rain storm.
|
|
|
|
|
|
HQQ-NPKA-BP56K
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|