Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Director of Wastewater Facilities
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
10/08/2025
|
|
|
10/08/2025
|
|
|
12:05 am to 01:15 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
51221
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Pine Street Barge Canal
|
|
|
Matthew Dow, Director of Wastewater Facilities
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 10/8/2025 resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|