View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Director of Wastewater Facilities    
Burlington    
Pine St CSO    
07/07/2025    
07/07/2025    
05:45 pm to 06:20 pm    
   
Authorized Wet Weather CSO Overflow    
535    
High Flows    
   
Combined sewer overflow structure    
None    
Pine Street Barge Canal    
Matthew Dow, Director of Wastewater Facilities    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 7.7.2025 resulted in the discharge of a combination of sewage and stormwater from the Pine ST CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   