Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine Street CSO    
11/12/2022    
11/12/2022    
05:42 am to 06:37 am    
   
Authorized Wet Weather CSO Overflow    
>1,000 to 10,000 gallons    
High Flows    
   
Combined sewer overflow structure    
None    
Pine Street Barge Canal    
Matthew Dow, Wastewater Facilities Manager    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 11.12.22 resulted in the discharge of a combination of sewage and stormwater from Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPP-4SV1-X8VVP