|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
11/06/2022
|
|
|
11/06/2022
|
|
|
10:28 pm to 11:04 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
3116 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Pine Street Barge Canal
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 11.6.22 resulted in the discharge of a combination of sewage and stormwater from Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPP-0SN8-ERCCB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|