Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Manhattan Dr CSO    
08/26/2022    
08/26/2022    
03:45 pm to 04:02 pm    
   
Authorized Wet Weather CSO Overflow    
>1,000 to 10,000 gallons    
High Flows    
   
Combined sewer overflow structure    
none    
Intervale Wetlands    
Matthew Dow, Wastewater Facilities Manager    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 8.26.2022 resulted in the discharge of a combination of sewage and stormwater from the Manhattan Dr CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HPM-7RQ5-J6FT0