Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Main WWTF
|
|
|
06/18/2022
|
|
|
06/18/2022
|
|
|
08:40 pm to 10:25 pm
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
Approximately 400,000
|
|
|
Mechanical Failure
|
|
|
|
|
|
WWTF outfall
|
|
|
Staff responded to the alarm and increased the disinfection dosage and monitored through the night. Staff are still looking into the cause of the RAS pump issues at the time of this post.
|
|
|
Lake Champlain
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A suspected issue with an RAS pump cause some minor solids loss, leading to the disinfection system not putting out enough sodium hypochlorite to adequately disinfect the treated effluent.
|
|
|
|
|
|