Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine St CSO    
08/04/2020    
08/04/2020    
08:08 pm to 10:08 pm    
   
Authorized Wet Weather CSO Overflow    
150,000-200,000    
High Flows    
   
Combined sewer overflow structure    
none    
Pine Street Barge Canal    
Megan Moir, Div Head Water Resources    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 8/4/2020 resulted in the discharge of a combination of sewage and stormwater from Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HP1-S63E-JPQQF