|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
05/15/2020
|
|
|
05/15/2020
|
|
|
06:36 pm to 07:23 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
Estimating 25,000-75,000 gallo
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Division Head, Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 5.15.2020 resulted in the discharge of a combination of sewage and stormwater from Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
At the time of posting gallons discharged were estimated due to inability to connect to flow meter remotely. When the connection can be made we will attempt to update the flow information.
|
|
|
|
|
|
HNZ-S8BR-K9VNH
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|