Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine St CSO    
10/31/2019    
11/01/2019    
09:50 pm to 10:13 am    
   
Authorized Wet Weather CSO Overflow    
CSO is still flowing, volume i    
High Flows    
   
Combined sewer overflow structure    
none    
Pine Street Barge Canal    
Matthew Dow, Wastewater Facilities Manager    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 11/1/2019 resulted in the discharge of a combination of sewage and stormwater from Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. The CSO is still flowing, volume is currently unknown and when the CSO stop we will post another report with the flow data.    
   
HNT-YTHX-9WW95