View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine Street CSO    
08/21/2019    
08/21/2019    
04:22 pm to 05:22 pm    
   
Authorized Wet Weather CSO Overflow    
100,000-250,000 based on other    
High Flows    
   
Combined sewer overflow structure    
none    
Pine Street Barge Canal    
Megan Moir, Division Head Water Resources    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 8.21.2019 resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Our flow instrumentation has malfunctioned, we are estimating a flow of 100,000 to 250,000 based on previous overflows of this size and duration.    
   
HNS-6FQF-47ZGZ