|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
07/11/2019
|
|
|
07/11/2019
|
|
|
10:48 pm to 11:29 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
79,122
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Division Head, Water Resources.
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on July 11th resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
Of the 79,122 gallons, approximately 4246 gallons are calculated to be the sewer component.
|
|
|
|
|
|
HNR-6TD7-2GCB3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|