Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine Street CSO    
06/20/2019    
06/20/2019    
01:23 pm to 03:18 pm    
   
Authorized Wet Weather CSO Overflow    
177,396 Gallons    
High Flows    
   
Combined sewer overflow structure    
none    
Pine Street CSO    
Megan Moir, Div. Head, Water Resources    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on June 20th resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Of the 177,396 gallons that overflowed, 23,374 gallons are calculated to be the sewer component.    
   