Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
06/20/2019
|
|
|
06/20/2019
|
|
|
01:23 pm to 03:18 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
177,396 Gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Pine Street CSO
|
|
|
Megan Moir, Div. Head, Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 20th resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
Of the 177,396 gallons that overflowed, 23,374 gallons are calculated to be the sewer component.
|
|
|
|
|
|