Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine Street CSO    
05/19/2019    
05/20/2019    
11:38 pm to 12:27 am    
   
Authorized Wet Weather CSO Overflow    
15,100    
High Flows    
   
Combined sewer overflow structure    
None    
Pine Street Barge Canal    
Megan Moir, Div. Head Water Resources    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on (insert date) resulted in the discharge of a combination of sewage and stormwater from CSO (insert CSO number or location). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HNP-X6NC-78E6C