View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine St CSO    
09/26/2018    
09/26/2018    
05:03 pm to 06:17 pm    
   
Authorized Wet Weather CSO Overflow    
300,000    
High Flows    
   
Combined sewer overflow structure    
none    
Pine St Barge Canal    
Megan Moir, Div Head Water Resources    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 9/26/2018 resulted in the discharge of a combination of sewage and stormwater from the Pine St. CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. This has been updated with flow data from a monitor at Pine St CSO. Of the 300,000 gallons discharged, the sewer component of the flow is estimated at approximately 9,250 gallons gallons    
   
HNH-4AFE-65G11