|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Pine St CSO
|
|
|
09/26/2018
|
|
|
09/26/2018
|
|
|
05:03 pm to 06:17 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
300,000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Pine St Barge Canal
|
|
|
Megan Moir, Div Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 9/26/2018 resulted in the discharge of a combination of sewage and stormwater from the Pine St. CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
This has been updated with flow data from a monitor at Pine St CSO.
Of the 300,000 gallons discharged, the sewer component of the flow is estimated at approximately 9,250 gallons gallons
|
|
|
|
|
|
HNH-4AFE-65G11
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|