Facility Name: Burlington Main    
Caller Name And Title: Matthew Dow, Wastewater Facilities Manager    
Municipality: City of Burlington    
Location (street or site): Pine St CSO    
Incident Start Date: 09/21/2018    
Incident End Date: 09/21/2018    
Incident Start End Times: 08:58 am to 09:36 am    
Estimated Duration Of Event:    
Nature Of Incident: Authorized Wet Weather CSO Overflow    
Estimated Volume (gallons): 89,100    
Cause Of Discharge: High Flows    
Type Of Obstruction:    
Point Of Discharge: Combined sewer overflow structure    
Corrective Action Taken: None    
Waterbody Impacted: Pine St Barge Canal    
Contact Name And Title For Public: Megan Moir, Div. Head Water Resources    
Call Date:    
WW Staff Called:    
Type Of Notification: nForms    
Public Overflow Report For Web: Y    
   
   
   
Description Of Incident: High flows caused by an intense rain storm on 9/21/2018 resulted in the discharge of a combination of sewage and stormwater from the Pine St CSO.This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. The estimated sewer component of this discharge is 3,400 gallons.    
   
nForm Submission Number: HNG-ZTNS-CHAP9