Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
City of Burlington    
Pine St CSO    
08/17/2018    
08/17/2018    
09:35 pm to 10:01 pm    
   
Authorized Wet Weather CSO Overflow    
40    
High Flows    
   
Combined sewer overflow structure    
none    
Pine St Barge Canal    
Megan Moir, Div Head, Water Resources    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 8.17.2018 resulted in the discharge of a combination of sewage and stormwater from Pine St CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. The flow information has been updated with flow data that was not available until after the 12 hour report. Our flow meter registered only a small amount for flow that actually overflowed equating to just under 40 gallons total.    
   
HNG-4P4M-XSSZY