|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
City of Burlington
|
|
|
Pine St CSO
|
|
|
06/18/2018
|
|
|
06/18/2018
|
|
|
09:23 pm to 11:43 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
120,000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from the Pine St CSO, the city has disconnected some upstream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Div. Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on on 6/18/2018 resulted in the discharge of a combination of sewage and stormwater from the Pine St CSO. This discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNE-NRVR-HMEK2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|