Facility Name:
|
Burlington Main
|
|
|
Matthew Dow
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
06/18/2018
|
|
|
06/18/2018
|
|
|
03:11 pm to 03:44 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
25,000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from the Pine St CSO, the City has disconnected some upstream catch basins from the sewer system and is developing a long term plan to eliminate this CSO.
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Div. Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 6/18/2018 resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine St. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. The sewage component is estimated to be approximately 1,200 gallons.
|
|
|
|
|
|
HNE-NCP7-BVYDG
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|