|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow
|
|
|
City of Burlington
|
|
|
Park St CSO
|
|
|
07/25/2018
|
|
|
07/25/2018
|
|
|
09:25 pm to 10:00 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
14,397
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Intervale Wetlands
|
|
|
Megan Moir, Div Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/25/2018 resulted in the discharge of a combination of sewage and stormwater from Park St. CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HNF-K02X-C3RH8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|