|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Wastewater Facilities Manager
|
|
|
Burlington
|
|
|
Pine Street CSO
|
|
|
04/16/2018
|
|
|
04/16/2018
|
|
|
07:24 pm to 08:11 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from the Pine street CSO. the city has disconnected some upstream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Div. Head Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm and snow melt on April 16th resulted in the discharge of a combination of sewage and storm water from the CSO located on Pine St. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. We estimate the sewage component to be approximately 2,000 gallons
|
|
|
|
|
|
HND-3ZKH-VJ7NP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|