Facility Name: Burlington Main    
Matthew Dow, Wastewater Facilities Manager    
Burlington    
Pine St. CSO    
08/22/2017    
08/22/2017    
06:15 pm to 07:23 pm    
   
Discharged untreated sewage    
>10,000 to 100,000 gallons    
High Flows    
   
Combined Sewer Overflow Structure    
In an effort to reduce overflows from Pine Street CSO, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.    
Pine St. Barge Canal    
Megan Moir, Water Resources Div. Head    
   
David DiDomenico    
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on August 22nd resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   