|
Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Chief Operator
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
07/17/2017
|
|
|
07/17/2017
|
|
|
10:52 am to 11:31 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from Pine Street CSO, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir, Water Resources Div Head
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on July 17th resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HN6-D56V-SRTTM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|