View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Chief Operator    
City of Burlington    
Pine Street CSO    
07/17/2017    
07/17/2017    
10:52 am to 11:31 am    
   
Discharged untreated sewage    
>10,000 to 100,000 gallons    
High Flows    
   
Combined sewer overflow structure    
In an effort to reduce overflows from Pine Street CSO, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.    
Pine Street Barge Canal    
Megan Moir, Water Resources Div Head    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on July 17th resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HN6-D56V-SRTTM