Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Chief Operator
|
|
|
City of Burlington
|
|
|
Manhattan Dr and Park St CSO
|
|
|
07/08/2017
|
|
|
07/08/2017
|
|
|
07:58 am to 08:10 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
none
|
|
|
Intervale Wetlands
|
|
|
Megan Moir, Water Resources Div. Head
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/8/2017 resulted in the discharge of a combination of sewage and stormwater from CSO at Manhattan Dr and Park St. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|