Facility Name: Burlington Main    
Matthew Dow, Chief Operator    
City of Burlington    
Pine Street CSO    
06/29/2017    
06/30/2017    
9 PM to 10 AM    
   
Discharged untreated sewage    
>500,000 to 1,000,000 gallons    
High Flows    
   
Combined sewer overflow structure    
In an effort to reduce overflows from Pine Street CS, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.    
Pine St Barge Canal    
Megan Moir, Water Resources Div. Head    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on June 29th resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. We received 2.32 inches of rain measured at the Main wastewater plant. At 12 hours the CSO was still discharging.    
   