Facility Name:
|
Burlington Main
|
Caller Name And Title:
|
Matthew Dow, Chief Operator
|
Municipality:
|
City of Burlington
|
Location (street or site):
|
Pine Street CSO
|
Incident Start Date:
|
06/23/2017
|
Incident End Date:
|
06/23/2017
|
Incident Start End Times:
|
08:35 am to 09:43 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
Estimated Volume (gallons):
|
>10,000 to 100,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
In an effort to reduce overflows from Pine Street, the city has disconnected some upstream stormwater catch basins from the sewer system, and is developing a long term plan.
|
Waterbody Impacted:
|
Pine Street Barge Canal
|
Contact Name And Title For Public:
|
Megan Moir, Water Resources Div. Head
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm and snow melt on June 23rd resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine Street. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and o prevent backups into homes and other buildings. We estimate the sewage component to be approximately 2,900 gallons.
|
|
|
nForm Submission Number:
|
HN5-T7VE-WN0FY
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|