Facility Name: Burlington Main    
Matthew Dow, Chief Operator    
City of Burlington    
Pine Street CSO    
06/23/2017    
06/23/2017    
08:35 am to 09:43 am    
   
Discharged untreated sewage    
>10,000 to 100,000 gallons    
High Flows    
   
Combined sewer overflow structure    
In an effort to reduce overflows from Pine Street, the city has disconnected some upstream stormwater catch basins from the sewer system, and is developing a long term plan.    
Pine Street Barge Canal    
Megan Moir, Water Resources Div. Head    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm and snow melt on June 23rd resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine Street. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and o prevent backups into homes and other buildings. We estimate the sewage component to be approximately 2,900 gallons.    
   
HN5-T7VE-WN0FY