Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Burlington Main    
Matthew Dow, Chief Operator    
City of Burlington    
Pine St CSO    
05/31/2017    
05/31/2017    
03:11 pm to 04:23 pm    
   
Discharged untreated sewage    
>10,000 to 100,000 gallons    
High Flows    
   
Combined sewer overflow structure    
In an effort to reduce overflows from the Pine St. CSO, the city has disconnected some upstream stormwater catch basins from the sewer system and is developing a long term plan to eliminate this CSO.    
Pine Street Barge Canal    
Megan Moir, Water Resources Div. Head    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm resulted in the discharge of a combination of sewage and storm water from the CSO located on Pine Street. This CSO is intended to protect the sewer system to prevent overflows from other parts of the sewer system and to prevent backups into homes and other builds. We estimate the sewage component of this overflow to be 3024 gallons.    
   
HN5-8CZP-BBF27