Facility Name:
|
Burlington Main
|
Caller Name And Title:
|
Matthew Dow, Chief Operator
|
Municipality:
|
Burlington
|
Location (street or site):
|
Main wastewater treatment facility
|
Incident Start Date:
|
03/31/2017
|
Incident End Date:
|
04/01/2017
|
Incident Start End Times:
|
04:00 pm to 03:40 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged treated and partly disinfected effluent
|
Estimated Volume (gallons):
|
>1,000,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
Operators changed processes reducing the hydraulic flow and increased the chemical feed.
|
Waterbody Impacted:
|
Lake Champlain
|
Contact Name And Title For Public:
|
Megan Moir, Assistant DPW Director - Water Resources
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
The rain and snow from Friday and Saturday raised the flows at the plant to a level where the hydraulic load pushed solids out of the process reducing the ability to fully disinfect the effluent. This resulted in an E.coli of 800 col/100mls
|
|
|
nForm Submission Number:
|
HN3-SCH8-EGGMB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|