Facility Name:
|
Burlington Main
|
|
|
Matthew Dow, Chief Operator
|
|
|
Burlington
|
|
|
Main wastewater treatment facility
|
|
|
03/31/2017
|
|
|
04/01/2017
|
|
|
04:00 pm to 03:40 pm
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>1,000,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
WWTF outfall
|
|
|
Operators changed processes reducing the hydraulic flow and increased the chemical feed.
|
|
|
Lake Champlain
|
|
|
Megan Moir, Assistant DPW Director - Water Resources
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The rain and snow from Friday and Saturday raised the flows at the plant to a level where the hydraulic load pushed solids out of the process reducing the ability to fully disinfect the effluent. This resulted in an E.coli of 800 col/100mls
|
|
|
|
|
|
HN3-SCH8-EGGMB
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|