View FacilityIncident Record


Facility Name: Burlington Main    
Matt Dow - Chief operator    
City of Burlington    
Pine Street CSO    
02/25/2017    
02/26/2017    
06:57 pm to 12:31 am    
   
Discharged untreated sewage    
>10,000 to 100,000 gallons    
High Flows    
   
Combined sewer overflow structure    
Some catch basins have been disconnected from this CSO. The City is developing a long term plan to eliminate this CSO.    
Pine Street Barge Canal    
Matt Dow    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm and snow melt on February 25th resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine Street. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   