Facility Name: Burlington Main    
Tim Grover, Chief Operator    
Burlington DPW    
Pine Street Burlington VT    
09/11/2016    
09/11/2016    
05:30 am to 05:56 am    
   
Discharged untreated sewage    
>1,000 to 10,000 gallons    
High Flows    
None    
Combined sewer overflow structure    
Some upstream catch basins have been disconnected from the combined sewer system. The City is developing a long term plan to eliminate the CSO.    
Pine Street Barge Canal    
Megan Moir, Water Resources Director    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 9/11/16 resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine Street.This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and buildings.    
   