|
Facility Name:
|
Burlington Main
|
|
|
Tim Grover Chief Operator
|
|
|
Burlington DPW
|
|
|
Pine Street CSO
|
|
|
07/14/2016
|
|
|
07/14/2016
|
|
|
03:26 pm to 04:01 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from the Pine Street CSO, the City has disconnected some upstream stormwater catch basins from the sewer system last fall and is developing a long term plan to eliminate this CSO.
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir - Assistant Director of Public Works (Water Resources)
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 7/14/16 resulted in the discharge of a combination of sewage and stormwater from CSO on Pine Street. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2H2-EV2V-W45N
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|