View FacilityIncident Record


Facility Name: Burlington Main    
Tim Grover, Chief Operator    
Burlington DPW    
Park St Burlington    
07/14/2016    
07/14/2016    
03:02 pm to 03:32 pm    
   
Authorized Wet Weather CSO Overflow    
>100 to 1,000 gallons    
High Flows    
   
Combined sewer overflow structure    
None    
Intervale Wetlands    
Megan Moir - Assisstant Director of Public Works (water Resources)    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 7/14/16 resulted in the discharge of a combination of sewage and stormwater from CSO at Park St. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   