Facility Name:
|
Burlington Main
|
|
|
Tim Grover Chief Operator
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
06/05/2016
|
|
|
06/05/2016
|
|
|
06:07 pm to 07:45 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from the Pine Street CSO, the City has disconnected some upstream stormwater catch basins from the sewer system, and is developing a long term plan to mitigate CSO's from this location in the future.
|
|
|
Pine Street Barge Canal
|
|
|
Megan Moir Water Resources Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on June 5th resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
2G3-Y2CA-GVRC
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|