Facility Name:
|
Burlington Main
|
|
|
Tim Grover Chief Operator
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
02/24/2016
|
|
|
02/25/2016
|
|
|
11:21 pm to 03:37 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>10,000 to 100,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
In an effort to reduce overflows from the Pine Street CSO the City disconnected some upstream stormwater catch basins from the sewer system last fall and is developing a long term plan to eliminate this CSO
|
|
|
Pine Street Barge Canal
|
|
|
Laurie Adams
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 2/24-2/25/16 resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine Street This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|