View FacilityIncident Record


Facility Name: Burlington Main    
Tim Grover Chief Operator    
City of Burlington    
Pine Street CSO    
02/24/2016    
02/24/2016    
05:03 pm to 06:18 pm    
   
Discharged untreated sewage    
>1,000 to 10,000 gallons    
High Flows    
   
Combined sewer overflow structure    
Two catch basins upstream were recently disconnected from the combined sewer system. Other measures for eliminating this CSO are being evaluated    
Pine Street Barge Canal    
Laurie Adams    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on February 24, 2016 resulted in the discharge of a combination of sewage and stormwater from the CSO Located on Pine Street in Burlington VT. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings    
   