|
Facility Name:
|
Burlington Main
|
|
|
Tim Grover Chief Operator
|
|
|
City of Burlington
|
|
|
Pine Street CSO
|
|
|
02/24/2016
|
|
|
02/24/2016
|
|
|
05:03 pm to 06:18 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
Two catch basins upstream were recently disconnected from the combined sewer system. Other measures for eliminating this CSO are being evaluated
|
|
|
Pine Street Barge Canal
|
|
|
Laurie Adams
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on February 24, 2016 resulted in the discharge of a combination of sewage and stormwater from the CSO Located on Pine Street in Burlington VT. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings
|
|
|
|
|
|
2DK-QTQF-F1Z0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|