Facility Name:
|
Brattleboro
|
|
|
Dan Tyler, Director DPW
|
|
|
Brattleboro
|
|
|
Stormwater outfall behind 460 Western Ave.
|
|
|
08/16/2025
|
|
|
08/18/2025
|
|
|
12:00 pm to 02:00 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
8000
|
|
|
Obstruction/Blockage
|
|
|
Partial obstruction grease
|
|
|
Stormwater collection system
|
|
|
Obstruction removed from the sewer line. Operators said it appeared to be grease. No rags or roots. The service area is approximately 30 residential connections.
Four impacted stormwater basins cleaned with vac-truck to remove any sewer from the sumps.
|
|
|
Whetstone Brook
|
|
|
Dan Tyler Director, DPW
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
A DPW employee picking up a downed limb noticed an odor around 11:00 am, 8/18/2025. Further investigation revealed a sewer in the stormwater collection. A partial obstruction in the sewer system caused untreated sewage to flow into the stormwater collection system. Approximately 3 gpm was flowing into the Whetstone. An employee of a nearby business said they smelled sewer a couple of days prior. 8000 gallons of discharge was estimated for the two day period.
|
|
|
|
|
|
HQE-YEDR-G5QMA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|