|
Facility Name:
|
Brattleboro
|
|
|
Bruce Lawrence, Chief Operator
|
|
|
Brattleboro
|
|
|
WWTP Discharge to Connecticut River
|
|
|
08/08/2018
|
|
|
08/09/2018
|
|
|
10:00 am to 10:00 am
|
|
|
|
|
|
Discharged treated and partly disinfected effluent
|
|
|
>500,000 to 1,000,000 gallons
|
|
|
Other
|
|
|
|
|
|
WWTF outfall
|
|
|
On receipt of verbal preliminary notification the chlorination feed system was checked and found to be operating properly, a follow up sample was taken and sent for analysis. Results were within limits for this sample.
|
|
|
Connecticut River
|
|
|
Bruce Lawrence, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
On August 9, 2018 notification was received from our contract lab that a preliminary look at our eColi sample collected on August 8 showed a possible high count. A follow up sample was sent in for analysis on Aug 9. Results of the follow up showed eColi count of 22 colonies/100. Instantaneous flow was 2.3 MGD, chlorine residual was 0.44 ppm at the time of the August 8 sample.
|
|
|
|
|
|
HNG-85FR-P4NTY
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|