|
Facility Name:
|
Brattleboro
|
|
|
Bruce Lawrence, Chief Operator
|
|
|
Guilford, VT
|
|
|
1436 Broad Brook Road, Guilford, VT
|
|
|
05/26/2017
|
|
|
05/26/2017
|
|
|
11:55 am to 12:55 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>10,000 to 100,000 gallons
|
|
|
Mechanical Failure
|
|
|
|
|
|
Manhole
|
|
|
Pumps operated in HAND, discharge stopped.
The electrical control issue was corrected, parts ordered for a permanent repair.
Station controls returned to AUTO and observed for correct operation.
Daily checks of this station will continue.
|
|
|
Broad Brook
|
|
|
Bruce Lawrence, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
An electrical failure in the control panel at the State of Vermont owned Welcome Center Pumping Station located at 1436 Broad Brook Road in Guilford, VT caused failure of all alarms and pumping functions at this station. This led to a discharge of 10,000 to 20,000 gallons to the Broad Brook.
|
|
|
|
|
|
HN5-4AW5-TJB6R
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|