Facility Name:
|
Troy & Jay
|
|
|
Steve Button
|
|
|
Troy/Jay
|
|
|
WWTF
|
|
|
03/06/2025
|
|
|
03/06/2025
|
|
|
05:30 am to 06:15 am
|
|
|
|
|
|
Other
|
|
|
18000
|
|
|
Mechanical Failure
|
|
|
|
|
|
WWTF outfall
|
|
|
At 5:30am the Operator received a page from the WWTF. Upon arriving at the Plant the Operator observed the level in Basin 1A looked low and discovered it was still de-canting. The Operator immediately ended the de-cant and started looking for the cause. We determined the level transducer in Basin 1A had failed and replaced it that morning.
Update:
We collected samples that morning (March 6th) and received E.coli results of >2419.6
We re-sampled E.coli on march 10th and received results of <1
|
|
|
Missisquoi River
|
|
|
Steve Button, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The level transducer in SBR Basin 1A failed. This caused Basin 1A to de-cant 4' lower than current settings lowering the de-canter into solids. Between the water quality and the turbidity the UVs had limited effectiveness.
Update:
We collected samples that morning (March 6th) and received E.coli results of >2419.6
We re-sampled E.coli on March 10th and received results of <1
|
|
|
|
|
|
HQA-ZY7A-H1SKM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|